Site Readiness Checklist: 12 checks before you sign the PO
A two-page checklist for the site walk before any AGV/AMR order. It covers the site conditions that most often push a deployment weeks past its plan.
- Floors — flatness, slopes, joints, cleanliness
- Traffic — aisle widths, crossings, mixed traffic with forklifts and people
- Wi-Fi — coverage and roaming in the real layout, not the drawing
- Interfaces — charging, doors, fire shutters, lifts, conveyors and load units
Get the Checklist
Confirm your e-mail and the 2-page checklist lands in your inbox straight away, ready to print for the site walk.
Inside
Who uses it
- End users, before the RFQBrief vendors on the site as it really is, so offers are based on reality.
- Integrators, during the site surveyCatch site risks before they turn into change orders and delays.
- Project managers, before go-liveRe-check what changed on site since the survey.