Site Readiness Checklist: 12 checks before you sign the PO

A two-page checklist for the site walk before any AGV/AMR order. It covers the site conditions that most often push a deployment weeks past its plan.

  • Floors — flatness, slopes, joints, cleanliness
  • Traffic — aisle widths, crossings, mixed traffic with forklifts and people
  • Wi-Fi — coverage and roaming in the real layout, not the drawing
  • Interfaces — charging, doors, fire shutters, lifts, conveyors and load units
2-page PDF12 checksPrint it for the site walk

Get the Checklist

Confirm your e-mail and the 2-page checklist lands in your inbox straight away, ready to print for the site walk.

Inside

Who uses it

  1. End users, before the RFQBrief vendors on the site as it really is, so offers are based on reality.
  2. Integrators, during the site surveyCatch site risks before they turn into change orders and delays.
  3. Project managers, before go-liveRe-check what changed on site since the survey.

Michał Cwajna — independent AGV/AMR deployment advisor, founder of ProLogLab. About 15 years on the shop floor of mobile-robot projects in CEE manufacturing and 3PL, across dozens of deployments and many different manufacturers. Vendor-agnostic: I don't sell robots, so the advice works for your project, not for a quota.